What a business pays per unit of water and sewer in San Francisco, copied from San Francisco Public Utilities Commission (SFPUC), Schedules W-1C and B. Effective 1 July 2026 (fiscal year 2026-27, meter readings on or after 1 July 2026).
| Charge | Published rate |
|---|---|
| Water, Schedule W-1C (commercial, industrial, public and general uses) | $13.13 per unit (1 unit = 100 cubic feet = 748 gallons), one rate for all units |
| Sewer, Schedule B (non-residential), volume | $11.34 per discharge unit; a discharge unit is metered water use times the flow factor, 90% by default |
Take the monthly water use from your bill. The calculator applies the published rates above line by line and shows every step. Changing nothing is a valid result.
Non-residential sewer also carries pollutant charges per pound (COD, suspended solids, oil and grease) set from standard loadings for each business group. The calculator leaves them out and applies the 90% default flow factor.
| Water: 100 × $13.13 per unit | $1,313.00 |
| Sewer volume: 90% of 100 × $11.34 per discharge unit | $1,020.60 |
| Total for these lines | $2,333.60 |
San Francisco Public Utilities Commission (SFPUC), Schedules W-1C and B publishes these charges (effective: 1 July 2026 (fiscal year 2026-27, meter readings on or after 1 July 2026)). Water, Schedule W-1C (commercial, industrial, public and general uses): $13.13 per unit (1 unit = 100 cubic feet = 748 gallons), one rate for all units; Sewer, Schedule B (non-residential), volume: $11.34 per discharge unit; a discharge unit is metered water use times the flow factor, 90% by default.
Each charge in the table above is applied to the water your meter records, in the way the table states. The charges listed under "Not included" come on top. The utility's own bill and rate ordinance always prevail. The calculator does this arithmetic for your own monthly use.
The rates are set by the utility, so on these published rates the bill moves with the volume you use. Knowing your cost per unit tells you what a saving is worth before you spend anything on it. Changing nothing is a valid result. The parts of the bill, with examples: how a commercial water bill is built.
From San Francisco Public Utilities Commission (SFPUC), Schedules W-1C and B, checked against the official source on 21 November 2026. The links are under "Source" above.
Restaurant: cost per cover · Hotel: cost per guest-night · Laundromat: cost per load · Car wash: cost per car · Office: cost per person · Shop: cost per staff member
New York City · Chicago · Houston · Philadelphia · San Antonio · San Diego · Dallas · Phoenix · Los Angeles · Seattle · Boston · Atlanta · Miami · Denver · Toronto · Vancouver · Sydney · Melbourne · Calgary · Brisbane · Singapore · Manila · Cape Town · Auckland · Québec City · Bogotá · Nairobi · Portland · Nashville · Charlotte · Columbus · Detroit · Ottawa · Edmonton · Perth · Adelaide · Austin · Washington DC · Pittsburgh · Kansas City · Raleigh · Salt Lake City · Hamilton · Tampa · Minneapolis · Gold Coast · Winnipeg · Hobart · Darwin · Canberra
Work out your cost per load, wash or guest
Missing a calculation for your business? Ask for a calculator. Spotted a rate that changed? Tell us; confirmed corrections appear on our corrections page.
Tariff index